Gujarat opens new Gambhira bridge a year after deadly collapse
The replacement two-lane bridge over the Mahi river, with 23 spans and epoxy-coated steel, was built in about a year.
For you: The collapse and the rebuild together are a lesson in bridge life cycle: design, inspection, maintenance and replacement. Nepal also has many bridges from the 1980s carrying far more traffic than they were built for. Corrosion protection, load rating and routine inspection are less visible than new construction, but they decide whether a bridge stays safe. These topics sit in BCE courses on bridge engineering and concrete durability.
Read the storyBCE



